Westside locations among city street upgrades listed through Oct. 9 Below are the locations scheduled by City Public Works for 2C and other road upgrade programs on the Westside during the time frame of Sept. 26-Oct. 9.-- Lower Gold Camp Road from 21st Street to 26th Street - concrete. -- 21st Street from Broadway Avenue to Lower Gold Camp Road - paving. -- 24th Street from Kiowa Street to Pikes Peak Avenue - concrete. -- 24th Street from Kiowa Street to Bijou Street - concrete. In general, note that there could be traffic impacts at any time in the work locations, including the temporary loss of a through lane or even a detour around the site. 2C was the name of the city-sponsored ballot measure that voters approved in last November's election. It established a .62 percent sales tax over a five-year span, dedicated to road improvements. The upgrades consist of concrete upgrades (where applicable) and new paving on a prioritized list of road segments. A city website with 2C information can be found at https://coloradosprings.gov/public-works/page/right-way-infrastructure- maintenance-funding.
Westside Pioneer/press release
Would you like to respond to this article? The Westside Pioneer welcomes letters at editor@westsidepioneer.com. (Click here for letter-writing criteria.) |